EV Charger Installation for Older Western Suburbs Homes
Most Wembley, Floreat and West Leederville homes weren't built for EVs. The switchboard was sized for a different era — before induction cooktops, ducted air con, and 32A EV chargers running every night.
I assess your load first, sort any switchboard work needed, then install the charger properly. No surprises.
What's Included
- Switchboard capacity check
- Load assessment for your home
- Cable run from board to charger
- Dedicated circuit installation
- Charger mounting and wiring
- Testing and commissioning
- Certificate of compliance
Older Homes Need a Load Check First
A 7kW EV charger draws 32A continuously — that's more than most 1960s-80s switchboards were designed to spare. Adding an EV charger without checking the board first can trip your mains or create a fire risk. I always assess before installing.
How EV Charger Installation Works
SMS Photos
Send photos of your switchboard, garage/charging location, and any existing power points nearby.
Load Assessment
I check your switchboard capacity and assess whether it can handle a 32A continuous EV draw alongside your existing loads.
Quote
You get a clear quote covering cable run, switchboard work (if needed), charger mounting, and testing.
Installation
Charger installed, tested, and ready to use. I walk you through the basics before leaving.
When Your Switchboard Needs Attention
Most western-suburbs homes built before the 1990s have switchboards that are technically compliant but running near capacity with modern loads. Adding an EV charger tips the balance.
Signs your board might need work before EV installation:
- Old ceramic fuses instead of circuit breakers
- No safety switches (RCDs) or only partial coverage
- Existing tripping issues with heavy loads
- Small mains (40-60A typical in older homes)
- Already running air con, pool pump, or induction cooktop
Not Sure About Your Switchboard?
SMS a photo of your switchboard and I'll tell you whether it needs attention before we can install an EV charger.
SMS Switchboard PhotoEC 9715 · $10 million public liability
EV Charger Installation FAQs
Do you handle EV charger installs in older Wembley homes?
Yes — and the load assessment matters more than the charger itself. Older Wembley boards weren't designed for a 32A continuous EV draw on top of induction, ducted air and pool equipment. I check the panel first, sort any switchboard upgrade needed, then mount the charger properly.
What brands do you install?
All major brands — Tesla, BYD, Hyundai, and generic Type 2 chargers. The installation process is similar regardless of brand. What matters more is your switchboard capacity and the cable run from board to garage.
How long does installation take?
Most installs take 2-4 hours if your switchboard has capacity. If an upgrade is needed, add another 2-4 hours. I'll let you know exactly what's needed after assessing your setup.
Do I need a switchboard upgrade?
Maybe. Many older western-suburbs homes were built with 40-60A mains — fine for the 1970s, but not for modern loads plus a 32A EV charger. I assess this before quoting and give you options if an upgrade is needed.
Ready for Home EV Charging?
SMS photos of your switchboard and garage. I'll reply with the next sensible step.
EC 9715 · $10 million public liability · Pensioner discounts available